ADUs allowed per lot

Up to 2

Maximum size

1,000 sq ft

Owner occupancy or parking

Not required

Last updated: •Reviewed by the aduglossary editorial team

Bellingham's current ADU rules took effect on December 23, 2025, under Ordinance 2025-12-035, which brought the city in line with Washington's ADU law (HB 1337, now RCW 36.70A.681). City rule updates RCW 36.70A.681

One warning before you start: the online municipal code for ADUs (BMC 20.10.036) still showed the older 2023 text when we checked, including the owner-occupancy and parking rules the city has since dropped. Go by the city's ADU page and Quick Guide, which reflect the new rules. City ADU Quick Guide

The rules at a glance

Bellingham ADU rules, 2026
ItemRule
Number per lotAttached or detached, with any main unit typeUp to 2City ADU page
WhereNot in the Lake Whatcom watershedResidential areasCity ADU page
Maximum sizePlus up to 800 sq ft of attached non-living space on one detached ADU1,000 sq ftCity ADU Quick Guide
Height, detachedOr 12 ft under the city's second height definition24 ftCity ADU Quick Guide
Height, attachedOr 20 ft under the second height definition35 ftCity ADU Quick Guide
Open space30% of the lotCity ADU Quick Guide
ParkingNone requiredCity ADU Quick Guide
Owner occupancyNot requiredCity ADU page

Setbacks

  • Detached ADU: 10 ft front and corner side, 5 ft interior side (0 ft on an alley), 0 ft rear. In the rear 32 ft of the lot, no side setback is needed. City ADU Quick Guide
  • Attached ADU: 10 ft front, rear and corner side, 5 ft interior side, with 0 ft rear or interior side on an alley. City ADU Quick Guide

Getting an ADU approved

An ADU needs a land use permit and a building permit from Planning and Community Development, through the Permit Center. The land use permit has to be approved before the building permit is issued. City ADU page

  • Type I: most ADUs. A staff decision with no neighbor notice.
  • Type II: projects with seven or more units, ADUs included. Owners within 500 ft get notice.
  • Type III-A: a detached ADU with more than 800 sq ft of attached non-living space. Needs a neighborhood meeting and a public hearing.

Bellingham has one set of registered, pre-approved ADU plans, bought from the architect. You still need both permits, but the city says review should be faster and cheaper. City ADU page

The city doesn't publish ADU review times. Washington law has set permit decision deadlines since January 1, 2025: 65 days for permits with no public notice, 100 days with notice, and 170 days with notice and a hearing, counted after the city confirms the application is complete. Permit Center reporting

Get quotes from Bellingham ADU builders

Ask for a free quote from an ADU builder in Bellingham

Free, with no obligation. We only share your project with a builder who works in your area.

Step 1: ProjectStep 2: Contact
4001,500

We share your details with at most one builder, and only one who works in your area.

Renting, short-term rentals and selling

  • Every rented ADU has to be registered with the city. Only an attached ADU on an owner-occupied lot with no other rentals is exempt from the registration fee and inspection. City ADU page
  • Short-term rentals aren't allowed in a detached ADU in a single-family zone. Elsewhere in residential zones, the host must live on site at least 270 days a year, whole-unit rentals are capped at 95 days a year, and each operator can run one short-term rental. City short-term rental rules
  • An ADU can be sold as a condominium unit. Splitting it onto its own lot is allowed only in specific cases, with an affordable, owner-occupied deed restriction. City ADU Quick Guide
  • An old owner-occupancy covenant can be removed by recording a release with the Whatcom County Auditor. Covenant release form

Frequently asked questions

How many ADUs can I build in Bellingham?

Up to two per lot, attached or detached, with a single-family house, duplex, triplex, fourplex or other main unit. ADUs are allowed wherever residential building is allowed, except in the Lake Whatcom watershed.

How big can an ADU be in Bellingham?

Up to 1,000 sq ft. One detached ADU can also have up to 800 sq ft of attached non-living space, such as a garage or workshop, with its own exterior door. More than that needs a Type III-A conditional use permit with a public hearing.

Do I have to live on the property?

No. Bellingham dropped its owner-occupancy rule in December 2025. If an old owner-occupancy covenant is recorded on your property, you can remove it by recording a release with the Whatcom County Auditor.

Does a Bellingham ADU need parking?

No. The city doesn't require parking for ADUs. Any parking you add by choice has to meet the city's parking standards.

Can I Airbnb my ADU in Bellingham?

Not a detached ADU in a single-family zone. In residential zones generally, the host has to live on site at least 270 days a year and can rent the whole unit for no more than 95 days a year. Commercial and urban village zones are looser, and every short-term rental needs a city permit.

Can I sell an ADU separately?

Yes, as a condominium unit. Splitting the ADU onto its own lot is allowed only in specific cases, and those lots must be deed-restricted as affordable, owner-occupied homes.

Sources

Checked November 23, 2026. Rules and fees change, so confirm with the city before you design.

Related