Free ADU Tool

ADU Bid Comparison

Got quotes back from builders? Enter them here to see how each one compares with typical costs for an ADU your size in your city, which line items to ask about, and which low bids may be missing work.

1. Your project

Between 200 and 2,000 sq ft.

Bids are compared with typical costs for a new detached ADU.

Typical all-in cost for a 600 sq ft detached ADU in San Diego, CA: $314,160 to $530,040 (midpoint $399,600). How we get this

2. Your bids

Bid 1
Bid 2

3. How they compare

Enter at least one bid total to see how it compares.

How the comparison works

The typical range comes from our ADU cost-by-size model: a per-square-foot construction cost for each city, plus design and engineering at about 12% of construction, the city's typical permit fees and utility connection costs. Each bid is checked against it:

  • Below the typical range: a total under the low end. Find out what's not included before treating it as a saving.
  • Above the typical range: a total over the high end. Premium finishes, a hillside or a long utility run can explain it, so ask.
  • Ask why: design or permits more than 20% above the typical amount, or site work, construction and finishes together above their typical range.
  • Confirm scope: design or permits under 50% of the typical amount, or site work, construction and finishes below their typical range. Part of the work may be missing or billed elsewhere.
  • Much lower than your other bids: with at least three bids, a total more than 20% under the middle of the others.

Site work, construction and finishes are compared as one amount. Builders split those lines in different ways, and the model counts typical site prep as part of construction, so comparing them one by one would mostly flag how a bid is laid out. A steep lot, a long sewer run or a panel upgrade can push this amount up legitimately. Use the flags as questions for the builder, not verdicts.

Questions to ask every builder

  • What exactly is excluded? Ask for the exclusions list in writing.
  • Who pays permit, plan check and impact fees, and are they in this price?
  • Does the price include sewer, water, gas and electrical connections, and any panel upgrade?
  • Which items are allowances, and what's the dollar amount for each?
  • What's the payment schedule, and is each payment tied to finished work?
  • How long will it take from permit to final inspection?
  • Can I see your license, insurance and two recent ADU projects?

Building in California? Check the deposit and draw schedule with the payment schedule checker before you sign.

Frequently asked questions

How many ADU bids should I get?

At least three. California's Contractors State License Board (CSLB) tells homeowners to get at least three written bids and to make sure each one covers identical plans, specifications and scope of work. With a third bid it's much easier to see which price is the outlier.

Why do ADU bids vary so much?

Mostly because they don't cover the same work. One bid may include plans, permit and impact fees, utility trenching and appliances, while another leaves them out or lists them as allowances. Site conditions, finish level, how busy the builder is and whether they use subcontractors also move the price. Line up the scope item by item before comparing totals.

Is the lowest ADU bid a red flag?

Not always, but don't accept it automatically. CSLB warns that a bid much lower than the others probably means the contractor made a mistake or isn't including all the work the others quoted. Ask the builder to put the full scope and any exclusions in writing, then compare it line by line.

What should an ADU bid include?

Plans and engineering (or who provides them), permit and impact fees, site prep and utility connections, the foundation and structure, plumbing, electrical and HVAC, finishes and fixtures, cleanup, the schedule, the payment schedule, and what's excluded. Allowances should name a dollar amount so you know what upgrades will cost.

Where do the typical amounts come from?

From the same 2026 cost model behind our ADU cost-by-size pages: a per-square-foot range for each city, plus design and engineering at about 12% of construction, and the city's typical permit and utility connection costs. They're market estimates for a new detached ADU, not a quote, so use them to decide what to ask about. For a conversion or junior ADU, the tool compares your bids with each other instead.

Is anything I type saved or sent?

Only if you use the form under the results. The comparison runs in your browser. A share link keeps the numbers in the part of the link after the # sign, which browsers don't send to our server, and the page removes it from the address bar once it loads. If you email yourself the comparison, we save your email, city, ADU size and the link so we can send it to you. If you ask a builder to contact you instead, we share your name, email, city, state, ADU size and how many bids you compared with that builder, never the bids themselves.

Typical amounts are 2026 market estimates for a detached ADU and aren't a quote. Your site, design and finishes change the price.