Portland, OR · Updated 2026

Portland ADU Permits: Fees, Timeline & Process

Oregon's ADU capital — SDC waivers, pre-approved plans, and no parking requirements.

Quick Answer

Portland ADUs: $150K–$400K

Permits: $18K–$42K · Updated April 2026

Get Your Exact Estimate

Portland ADU Permitting: Overview

Portland is one of the most ADU-friendly cities in the country. Oregon law requires all cities to allow ADUs on any residential lot, and Portland has gone further with pre-approved plans, SDC waiver programs, and streamlined permitting. The city processes ADU permits through Portland Permitting & Development (PP&D), with most reviews completed in 6–12 weeks.

Portland's SDC waiver program is a major cost saver — if you agree not to use the ADU as a short-term rental for 10 years, the city waives System Development Charges that can total $15,000–$37,000. Pre-approved plans from the City of Eugene (adapted for Portland) are available free of charge and can significantly speed up the review process.

Permit Fees Breakdown

Total permitting costs in Portland typically range from $18,000–$42,000 depending on ADU type, size, and site conditions.

Fee TypeAmountNotes
Building Permit$900–$2,000Based on project valuation
Plan Review$570–$1,300Building + residential site plan review
Land Use Review$250–$580Zoning compliance verification
Sanitary SDC (BES)$6,640Waivable with 10-year covenant
Parks SDC$7,100Waivable with 10-year covenant
Transportation SDC (PBOT)$2,940Waivable with 10-year covenant
Water SDC$2,280Plus $8,070 domestic service connection
School Excise Tax$750–$1,000Based on square footage
State Surcharges$320–$500Building, mechanical, plumbing, electrical

Fees are estimates based on typical ADU projects. Contact Portland permitting for exact quotes. See our full permit fees guide for comparison across cities.

Zoning & Requirements

  • ADUs allowed on any residential lot in Portland — no minimum lot size
  • One ADU per lot (detached or attached); two ADUs may be allowed on some lots
  • Maximum size: 75% of primary dwelling or 800 sq ft, whichever is less
  • Height limit: 20 feet for detached ADUs
  • Setbacks: 5 feet side/rear for detached; reduced to 0 for conversions
  • No parking required for ADUs
  • No owner-occupancy requirement

Step-by-Step Permit Process

1

Check zoning & eligibility

Use Portland Maps to verify your lot qualifies. Most single-family residential lots are eligible.

2

Select or create plans

Choose from free pre-approved plans or hire an architect for custom designs. Pre-approved plans skip much of the review process.

3

Submit permit application

Apply online through the PP&D Development Hub. Include site plan, floor plans, elevations, structural calculations, and energy compliance docs.

4

Pay plan review fees

Building, land use, and site plan review fees are due at submission.

5

Plan review (6–12 weeks)

Zoning, building, fire, and public works departments review plans. Respond to any correction notices within 2 weeks.

6

Pay SDCs and permit fees

Pay remaining fees including SDCs (or apply for the SDC waiver). Permit is issued once all fees are paid.

7

Construction & inspections

Schedule inspections at each phase: foundation, framing, rough mechanical, insulation, and final.

8

Certificate of Occupancy

Pass final inspection to receive your CO. The ADU is now legal for occupancy.

Key Regulations & Laws

Oregon HB 2001 (2019)

Requires all Oregon cities to allow ADUs on any residential lot. Portland complied and expanded beyond minimum requirements.

SDC Waiver Program

Homeowners who covenant not to use the ADU as a short-term rental for 10 years can have SDCs waived — saving $15,000–$37,000.

No Parking Mandate

Portland does not require additional parking for ADUs, freeing up yard space and reducing project costs.

Pre-Approved Plans

Free pre-approved plans available through the city, originally developed by the City of Eugene. These meet building code and speed up review.

Frequently Asked Questions

How much does an ADU permit cost in Portland?

Building permit and plan review fees run $3,000–$5,000. System Development Charges add $15,000–$37,000, but these can be waived through Portland's SDC waiver program if you agree not to short-term rent the ADU for 10 years. Total fees range from $3,000 (with waiver) to $42,000 (without).

How long does ADU permitting take in Portland?

Most permit reviews take 6–12 weeks after a complete application is submitted. Pre-approved plans can reduce this timeline. The full project from design to move-in typically takes 10–16 months.

Do I need to live on the property to build an ADU in Portland?

No. Portland has no owner-occupancy requirement for ADUs. You can build an ADU and rent both the main house and the ADU.

Can I use my ADU as an Airbnb in Portland?

Yes, but if you received an SDC waiver, you cannot use the ADU as a short-term rental for 10 years. Without the waiver, short-term rentals are allowed subject to Portland's short-term rental regulations.

TerraLineFree Beta

Track Every Dollar of Your ADU Build

TerraLine is the construction finance cockpit that shows your loan balance, budget burn, and forecast at completion — all on one screen. No more spreadsheets.

Try TerraLine Free

Ready to Start Your ADU Project?

Join hundreds of homeowners who used our guides to navigate their ADU build successfully.

✓ Free comprehensive guide    ✓ Vetted contractor list    ✓ No credit card needed