The short version
- No impact fees on an ADU of 750 sq ft or less, measured as interior livable space.
- Your city has 15 business days to say whether your application is complete, and 60 days to approve or deny it.
- Junior ADUs (JADUs, units of up to 500 sq ft inside the house) and ADUs the state requires every city to approve cannot be rented for 30 days or less.
- No owner-occupancy rule for ADUs, and none for a JADU that has its own bathroom.
The Four ADU Bills Signed in October 2025
Governor Newsom signed all four on October 10, 2025. Three took effect on January 1, 2026. AB 462 was an urgency bill and took effect the day it was signed.
SB 543
Effective January 1, 2026Size is measured as interior livable space, plus firm permit deadlines
- ADU and JADU size limits now count only interior livable space (the area used for living, sleeping, eating, cooking or sanitation), not exterior walls.
- No impact fees on an ADU with 750 sq ft of interior livable space or less, or a JADU with 500 sq ft or less. Above 750 sq ft, fees must be proportional to the ADU's size relative to the main house.
- ADUs and JADUs under 500 sq ft of interior livable space are treated as not adding assessable space for school fees, so school fees on them stop.
- The city must decide whether an application is complete within 15 business days, and list what is missing if it is not. If it misses that deadline, the application is deemed complete.
- You can appeal an incompleteness finding or a denial in writing, and the city must issue a final written decision within 60 business days.
AB 1154
Effective January 1, 2026JADU owner-occupancy narrowed, and no short-term rentals
- The owner only has to live on the property if the JADU shares a bathroom with the main house. A JADU with its own bathroom has no owner-occupancy rule.
- JADUs, and ADUs approved under the state's standard by-right categories (the unit types every city must approve, such as a garage conversion or a detached ADU of up to 800 sq ft), can only be rented for terms longer than 30 days. Cities may apply the same rule to other ADUs.
SB 9 (2025)
Effective January 1, 2026City ADU ordinances must be filed with the state
- A city or county must send its ADU ordinance to the state housing department (HCD) within 60 days of adopting it, and answer any HCD findings within 30 days.
- If it misses either deadline, the ordinance is null and void, and the state rules apply instead.
- This is a different bill from the 2021 SB 9 that allows lot splits and duplexes.
AB 462
Effective October 10, 2025 (urgency bill)Faster coastal permits and ADUs first after a disaster
- In the coastal zone, a city with a certified Local Coastal Program must approve or deny a coastal development permit for an ADU within 60 days, and that permit can no longer be appealed to the Coastal Commission.
- After a disaster, an ADU can get its certificate of occupancy before the main house is rebuilt. Three conditions apply: the Governor declared an emergency for the county on or after February 1, 2025, the main house was destroyed or substantially damaged, and the ADU has passed all inspections.
- Law-firm summaries describe this as applying to detached ADUs, so confirm with your building department.
California ADU Rules at a Glance
State ADU law sits in Government Code sections 66310 to 66342, which SB 477 reorganized in 2024. A city can be more generous than these rules but not stricter.
| Topic | State rule (2026) |
|---|---|
| Approval | Ministerial (staff-level, no hearing). The city must approve or deny a complete application within 60 days. |
| Owner-occupancy | Cannot be required for ADUs (AB 976 made this permanent). For JADUs, only if the JADU shares a bathroom (AB 1154). |
| Units on a single-family lot | One ADU and one JADU inside the house or an existing structure, plus one new detached ADU up to 800 sq ft. |
| Units on a multifamily lot | Conversions of non-living space (up to 25% of existing units, at least one) plus up to 8 detached ADUs, but no more detached ADUs than existing units (SB 1211). |
| Size cities must allow | Every lot must be allowed an ADU of at least 800 sq ft, and a city's maximum size cannot be lower than 850 sq ft for a studio or one-bedroom or 1,000 sq ft for two or more bedrooms. |
| Setbacks | Cities cannot require side or rear setbacks of more than 4 feet for a new ADU. |
| Impact fees | None at 750 sq ft of interior livable space or less. Proportional above that. |
| Utility connection fees | None for an ADU or JADU built inside existing space, unless it is built with a new house or sold separately. For other ADUs, fees must be proportional to the unit's size or plumbing fixtures. |
| Short-term rentals | JADUs and ADUs approved under the by-right categories can only be rented for terms longer than 30 days. |
| HOAs | Cannot ban ADUs or JADUs or make them unreasonably costly to build (Civil Code 4751). |
| Separate sale | Only where the city or county has opted in under AB 1033. |
Height, parking and design rules depend on the type of ADU and how close the lot is to transit. Your city's ADU ordinance and HCD's ADU handbook have the details.
What This Means If You're Planning an ADU
Design to 750 sq ft of livable space
Because size is now measured inside the walls, a unit that is a little over 750 sq ft on the outside can still qualify for the fee exemption. See the impact fees guide for what larger units pay.
Plan for long-term tenants
If your rental math assumes nightly rates, rework it with monthly rents. The ADU rent estimator shows typical long-term rents by city.
Push back on slow or incomplete reviews
Keep the date you submitted. If 15 business days pass without a completeness decision, your application is deemed complete, and a denial can now be appealed in writing.
Check that your city's ordinance is valid
Since 2026, an ordinance not sent to HCD within 60 days of adoption, or not corrected within 30 days of HCD findings, is void, and the state rules apply. Ask HCD or your planning department if you are unsure.
Other California ADU Laws Still in Force
- AB 1033 (2023): lets a city or county opt in to separate sale of ADUs as condominiums. See selling an ADU separately.
- AB 1332 (2023, effective 2025): requires cities to offer pre-approved ADU plans. See pre-approved ADU plans.
- AB 2533 (2024): eases permits for unpermitted ADUs built before 2020. See ADU amnesty programs.
- SB 1211 (2024): allows up to 8 detached ADUs on multifamily lots.
- AB 976 (2023): permanently bars owner-occupancy requirements for ADUs.
Frequently Asked Questions
What are the new California ADU laws for 2026?
Four bills signed on October 10, 2025 changed ADU rules. SB 543 measures size as interior livable space, bans impact fees on ADUs of 750 sq ft or less, and sets a 15-business-day completeness deadline with a written appeal process. AB 1154 limits JADU owner-occupancy to JADUs that share a bathroom and bans rentals of 30 days or less for JADUs and by-right ADUs. SB 9 (2025) voids local ADU ordinances that are not filed with the state within 60 days. AB 462 speeds coastal ADU permits and lets an ADU be occupied before a destroyed main house is rebuilt.
Can I rent my California ADU on Airbnb?
Usually not for short stays. Since January 1, 2026, JADUs and ADUs approved under the state's by-right categories can only be rented for terms longer than 30 days (AB 1154). Cities can extend that rule to other ADUs, and many already ban short-term rentals of ADUs. Check your city's rules before listing a unit.
Do I have to live on the property to build an ADU in California?
No. Cities cannot require owner-occupancy for an ADU, and AB 976 made that permanent. For a JADU, the owner has to live on the property only if the JADU shares a bathroom with the main house.
Are ADU impact fees waived in California?
Yes, for smaller units. A city cannot charge impact fees on an ADU with 750 sq ft of interior livable space or less, or a JADU with 500 sq ft or less. Larger ADUs pay fees proportional to their size relative to the main house. This exemption has no end date. Utility connection fees and school fees follow separate rules.
How long does a California city have to approve an ADU permit?
The city has 15 business days to decide whether your application is complete, then 60 days to approve or deny a complete application. If it misses the completeness deadline, the application is deemed complete. Applications that use a city's pre-approved ADU plans must be decided within 30 days.
Sources
- Best Best & Krieger: Governor Newsom signs four new ADU bills (Nov 7, 2025)
- LA County Planning: memo implementing SB 543 and AB 1154 (Dec 30, 2025)
- SB 543 enrolled text, Chapter 520, Statutes of 2025
- Government Code 66311.5 (ADU fees, current text)
- SB 9 (2025) chaptered text, Chapter 510
- Terner Center: California housing legislative round-up 2025
- Lozano Smith: SB 543 and school impact fees (Apr 9, 2026)
- California HCD: ADU handbook and resources
This page explains state law in plain English and is not legal advice. Cities can be more generous than state law, so check your local ADU ordinance too.
Track Every Dollar of Your ADU Build
TerraLine is the construction finance cockpit that shows your loan balance, budget burn, and forecast at completion — all on one screen. No more spreadsheets.