AB 1033

Can You Sell an ADU Separately in California?

Yes, but only where your city or county has opted in. Here's where it's allowed and what the process involves.

Last updated: •Reviewed by the aduglossary editorial team

Jan 2024

AB 1033 took effect

Opt-in

City or county must adopt it

9

Jurisdictions reported to have opted in

$530,000

First separate sale, San Jose

How AB 1033 Works

Normally an ADU is part of the same lot as the main house and can only be sold with it. AB 1033, which took effect January 1, 2024, lets a city or county allow the ADU and the main house to become two separate condominiums. Each condo gets its own title, so it can be sold, mortgaged and taxed on its own.

The catch is that it's opt-in. State law only gives cities and counties the option. Until your jurisdiction adopts an ordinance, separate sale isn't available, and even where it is, you need your lender's consent and a recorded condo plan and subdivision map.

This is not a lot split

AB 1033 creates two condos on one lot that share the land through a homeowners association. Splitting a lot into two separate parcels is a different process under SB 9 (2021).

Where You Can Sell an ADU Separately (Late 2026)

These are the jurisdictions reported to have adopted AB 1033 ordinances. Most dates come from industry trackers, and some disagree, so confirm with your planning department before you start.

San Jose

July 2024

First city to opt in. Its first separately sold ADU closed in 2026.

City of San Diego

2025

Applies inside city limits. Trackers date the ordinance July to August 2025.

San Francisco

2025

Limited to certain newer detached ADUs.

Oakland

2025

Reported as adopted in July 2025.

Santa Monica

2025

Sources differ on the month.

Santa Cruz

2024 or 2025

Sources differ on the date.

Berkeley

January 2026

Reported by Maxable's tracker.

Sebastopol

February 2026

Reported by Maxable's tracker.

San Diego County (unincorporated areas)

March 2026

Ordinance No. 10986, in effect from April 2026. Covers unincorporated areas only, not cities inside the county.

West Hollywood is listed as adopted (February 2025) by two trackers, but another found no ordinance, so we have left it out until it can be confirmed. Not yet adopted as of our last check (mid-2026): the City of Los Angeles and unincorporated Los Angeles County. A Los Angeles council motion was sent to committee in July 2025.

San Diego: Available in the City and the County

In San Diego, separate sale is reported as available in both the city and the surrounding unincorporated county. The County Board of Supervisors voted unanimously on March 4, 2026 to adopt Ordinance No. 10986, which took effect in April 2026. The County then published a checklist of what an application needs:

  • Written consent from every lienholder or deed-of-trust holder
  • Written authorization from any existing HOA
  • Proof that water, sewer, gas and electric providers were notified
  • A plot plan and a condo plan prepared by a licensed surveyor or civil engineer
  • Proposed HOA bylaws and CC&Rs that meet the Davis-Stirling Act
  • A tentative parcel map (4 or fewer units) or tentative map (5 or more)

The County's rules cover unincorporated areas only. If you live in a city inside the county, such as Chula Vista, Escondido or Oceanside, check that city's rules. For building costs, see the San Diego ADU cost guide and San Diego ADU permits.

Step by Step: Selling an ADU as a Condo

These steps follow San Diego County's published checklist. Other jurisdictions are similar, but check yours.

1

Confirm your city or county has opted in

AB 1033 does nothing on its own. Your jurisdiction must adopt an ordinance first. If it hasn't, you cannot sell the ADU separately, no matter how the unit was permitted.

2

Make sure the ADU is permitted and finished

The ADU needs a signed-off building permit. The condo plan cannot be recorded until the ADU has passed a safety inspection, shown by a certificate of occupancy or an equivalent inspection report. Junior ADUs (JADUs) are not eligible.

3

Get written consent from every lender

Each lienholder on the property, such as your mortgage lender or home equity line of credit lender, must consent in writing, and that consent is recorded with the condo plan. A lender can refuse or attach conditions, and this is where many projects stall.

4

Get approval from any existing HOA

If the property is already in a homeowners association, you need its written authorization, usually a board vote and sometimes a membership vote.

5

Notify the utilities

You must give notice to the water, sewer, gas and electric providers. Once the ADU is sold separately, the utility can require its own connection and charge for it.

6

Hire a surveyor or civil engineer for the condo plan

A licensed surveyor or civil engineer prepares the condo plan, which is filed with a tentative parcel map (4 or fewer units) or tentative map (5 or more).

7

Set up the HOA and CC&Rs

Dividing a property into two condos creates a common interest development under California's Davis-Stirling Act, even with only two units. You need CC&Rs (the recorded rules for the property), bylaws and an association that covers shared items like the land, insurance and utilities.

8

Record the map, then the CC&Rs, then sell

After the tentative map is approved, you record the parcel or final map, then the CC&Rs. In San Diego County, tentative approval expires after 3 years if no final map is recorded.

Planning an ADU you might sell later?

Design and permit it so it can qualify: a full ADU (not a JADU), fully permitted, with room for its own utility connections.

The First Separate ADU Sale: San Jose

San Jose, the first city to opt in, approved the parcel map for a 749 sq ft, two-bedroom ADU near downtown on August 14, 2025. The unit sold for $530,000 in mid-2026. It's widely reported as the first ADU in California sold separately from its main house.

A sale lets an owner recover building costs at once instead of through years of rent. See ADU cost by city to compare.

Costs, Taxes and Financing to Plan For

Professional fees

A surveyor or engineer for the condo plan, map application fees, and an attorney for the CC&Rs and HOA. No official fee schedule covers all of this, so get written quotes.

Separate utilities

Once an ADU is sold separately, the utility can require its own connection and charge connection or capacity fees for it.

Property tax

The sale is a change of ownership, so the buyer's condo is assessed at its purchase price under Proposition 13.

Income tax

Selling part of your property can trigger capital gains tax. Talk to a tax professional before you list.

Buyer financing

Buyers need a condo mortgage. Lenders review condo projects, and a two-unit association may need extra paperwork.

Ongoing HOA

You and the buyer share an association, insurance and shared-area costs, so the CC&Rs need to be clear from the start.

Frequently Asked Questions

Can I sell my ADU separately from my house in California?

Only if your city or county has adopted an ordinance under AB 1033. The law took effect January 1, 2024, but it is opt-in. Where it applies, you divide the property into two condominiums, one for the main house and one for the ADU, and each can then be sold and financed on its own.

Which California cities allow ADUs to be sold as condos?

As of late 2026, opt-in ordinances have been reported in San Jose, the City of San Diego, San Francisco (certain newer detached ADUs only), Oakland, Santa Monica, Santa Cruz, Berkeley and Sebastopol, plus the unincorporated areas of San Diego County from April 2026. Los Angeles had not adopted one as of mid-2026. Confirm with your planning department, because the list changes.

Can I sell my ADU separately in San Diego?

Separate sale is reported as available in both the City of San Diego and the unincorporated areas of San Diego County. The County Board of Supervisors adopted its ordinance (No. 10986) on March 4, 2026, and it took effect in April 2026. If your home is in another city in the county, such as Chula Vista or Oceanside, that city's own rules apply.

Does my mortgage lender have to approve the sale of my ADU?

Yes. AB 1033 requires written consent from every lienholder before the condo plan can be recorded. A lender can refuse or add conditions, so talk to yours early.

Can I sell a junior ADU (JADU) separately?

No. AB 1033 separate sale is for ADUs. JADUs, which are built inside the main house, are not eligible.

Sources

This page is general information, not legal or tax advice. Separate sale involves a subdivision map, recorded CC&Rs and lender consent, so work with a local land-use attorney.

TerraLineFree Beta

Track Every Dollar of Your ADU Build

TerraLine is the construction finance cockpit that shows your loan balance, budget burn, and forecast at completion — all on one screen. No more spreadsheets.

Try TerraLine Free

Related Guides