Bellingham, WA ADU cost guide

What an ADU Costs in Bellingham (2026)

One local builder's price, detached

$450–$650/sq ft

1-bedroom rent, late 2026

About $1,530–$1,590

ADUs allowed per lot

Up to 2

Last updated: •Reviewed by the aduglossary editorial team

Bellingham rewrote its ADU rules in December 2025 to meet Washington's HB 1337. You can now build up to two ADUs on a lot, up to 1,000 sq ft each, with no owner-occupancy or parking requirement. City ADU page

This guide pulls together what ADUs cost to build here, the city fees you'll pay and what one can rent for, with a source next to every number. The rules themselves are in our Bellingham ADU permit guide.

What builders charge

Published ADU construction prices in Bellingham, 2026
ItemPublished figure
Detached ADU, 500 to 1,000 sq ftDesign, permits, construction, standard utility connections$225,000–$650,000Bellingham ADU Builders
Detached ADU, per sq ftSame scope$450–$650Bellingham ADU Builders
800 sq ft detached, all-inBuilder's 2024–2026 projects$360,000–$400,000Bellingham ADU Builders
Attached ADU, per sq ft$350–$500Bellingham ADU Builders
Garage conversion, per sq ft$200–$300Bellingham ADU Builders
National plan seller's estimateAn estimate, not local bids$298–$570+/sq ftBuild With A Plan

We couldn't find an independent 2025 or 2026 cost survey for Bellingham, so these figures come from businesses that sell ADU work. Treat them as a starting point. The builder's own $360,000 to $400,000 for 800 sq ft works out below its per-sq-ft range, which shows how much the scope behind a quote matters.

The same builder says difficult sites can add $10,000 to $50,000, and site work, landscaping and rural septic or wells may also be extra. Bellingham ADU Builders Get at least three bids on the same plans and line them up in our ADU bid comparison.

City fees and utility charges

Bellingham ADU fees
ItemAmount
Land use application, Type I ADUFrom Oct 1, 2026; $147 for a second ADU filed together$2942026 land use fees
Building permitPriced on the project's valuationVariesCity permit fees
Park impact fee, per ADUHalf the multi-family rate; 2018 schedule, confirm the current figure$1,470.93Park impact fees
Transportation impact fee1–2 story multi-family, townhome or ADU, per unit; confirm the current figure$1,514BMC 19.06.040
School impact feeThe schedule lists single-family ($4,133) and multi-family ($1,793), not ADUs; ask the cityAskSchool impact fees
Water connection chargeSet by meter size and raised each year with inflationAskBMC 15.08.250

Washington caps impact fees on an ADU at half of what the city would charge for the main home. RCW 36.70A.681 A local builder budgets $4,000 to $12,000 for permit fees and $8,000 to $21,000 for city utility connections. Bellingham ADU Builders Ask the Permit Center for a fee estimate once you have a site plan; it can also tell you about the city's impact fee deferral program. City permit fees

Get quotes from Bellingham ADU builders

Ask for a free quote from an ADU builder in Bellingham

Free, with no obligation. We only share your project with a builder who works in your area.

Step 1: ProjectStep 2: Contact
4001,500

We share your details with at most one builder, and only one who works in your area.

What a Bellingham ADU can rent for

One-bedroom apartments averaged $1,529 a month on Zumper in November 2026 and $1,585 on RentCafe in October 2026. Zumper RentCafe A detached ADU with its own entrance often competes well with apartments, but check listings near you before you count on a number.

Every rented ADU has to be registered with the city's rental program, and short-term rentals are limited. City ADU page City short-term rental rules If you're weighing financing, see ADU financing options.

Frequently asked questions

How much does an ADU cost in Bellingham?

Published 2026 pricing from a Bellingham ADU builder puts a new detached ADU at $450 to $650 per sq ft, or about $225,000 to $650,000 for 500 to 1,000 sq ft, including design, permits, construction and standard utility connections. The same builder quotes $360,000 to $400,000 all-in for a typical 800 sq ft unit. These are a builder's own figures, not an independent survey, so get several bids.

What fees does Bellingham charge for an ADU?

Expect a land use application fee ($294 for a typical Type I ADU from October 1, 2026), a building permit priced on the project's value, utility connection charges, and impact fees. State law caps ADU impact fees at half of what the main home would pay. A local builder estimates permit fees at $4,000 to $12,000 and city utility connections at $8,000 to $21,000.

How much rent can a Bellingham ADU earn?

One-bedroom apartments in Bellingham averaged about $1,530 to $1,590 a month in late 2026, according to Zumper and RentCafe. A new detached ADU with its own entrance and yard space may rent at or above that, but check comparable listings near you.

Can I build two ADUs in Bellingham?

Yes. Since December 23, 2025, Bellingham allows up to two ADUs per lot, attached or detached, with no owner-occupancy or parking requirement. See our Bellingham ADU permit guide for the full rules.

Sources

Checked November 23, 2026. Rules and fees change, so confirm with the city before you design.