ADU cost by size
800 sq ft ADU Cost (2026)
Median of 16 markets at 800 sq ft, all-in
$411,000
Lowest to highest market at 800 sq ft
$320,000 to $617,000
Median per sq ft at 800 sq ft
$514
Last updated: •Reviewed by the aduglossary editorial team
An 800 sq ft ADU is big enough for a real one-bedroom with a den, or a compact two-bedroom, and in California it's the largest size state law guarantees on almost any lot. Here's what one costs to build in 2026 in 16 markets, how the price changes with size, and what to plan for.
Cost by market
| Market | 800 sq ft, typical range | $/sq ft (800) |
|---|---|---|
| Charlotte, NC | $245K–$431K | $400 |
| Raleigh, NC | $249K–$436K | $406 |
| Phoenix, AZ | $265K–$460K | $431 |
| Dallas, TX | $274K–$479K | $443 |
| Austin, TX | $290K–$507K | $473 |
| Denver, CO | $299K–$517K | $485 |
| Scottsdale, AZ | $307K–$529K | $490 |
| Portland, OR | $313K–$532K | $504 |
| Sacramento, CA | $328K–$556K | $523 |
| Los Angeles, CA | $385K–$668K | $621 |
| Seattle, WA | $387K–$671K | $624 |
| San Diego, CA | $411K–$696K | $655 |
| Oakland, CA | $439K–$766K | $716 |
| San Jose, CA | $462K–$790K | $745 |
| Bay Area, CA | $463K–$813K | $748 |
| La Jolla, CA | $483K–$832K | $772 |
Typical all-in range for a new detached ADU in 2026, including design, permits and utility connections, from our cost-by-size model. Sorted from least to most expensive. Our 16 markets lean toward the West Coast, so treat the median as a guide, not a national average. Not a quote.
The cheapest market in our model, Charlotte, NC, comes in at about $320,000 at the midpoint; the most expensive, La Jolla, CA, at about $617,000. Labor rates, permit and utility fees, and how busy local builders are explain most of the gap. Within a city, finish level and site conditions explain most of the range.
How size changes the price
| Size | Median all-in cost | Median per sq ft |
|---|---|---|
| 400 sq ft | $216,000 | $540 |
| 600 sq ft | $313,000 | $521 |
| 800 sq ft (this page) | $411,000 | $514 |
| 1,000 sq ft | $508,000 | $509 |
| 1,200 sq ft | $606,000 | $505 |
Total cost rises with size, but cost per square foot falls. Permits, utility hookups, the kitchen and the bathroom cost about the same in a small unit as in a large one, so each added square foot is mostly framing, drywall and flooring. Medians are across the 16 markets in our model, seven of them in California.
What fits in 800 sq ft
- A one-bedroom with a separate office or den, one bathroom, and a full kitchen open to the living area.
- A compact two-bedroom, one-bath unit with small bedrooms and an open kitchen and living room.
- Room for a stacked washer and dryer and real closets, which help with long-term renters.
Over 800 sq ft, a second bathroom becomes practical. If you're planning two bedrooms for a family or roommates, compare the 2-bedroom ADU cost guide.
Rules that matter at 800 sq ft
- California: cities must allow an ADU of up to 800 sq ft with 4-foot side and rear setbacks, even where local size, lot coverage, open space or front setback rules would block it, and can't cap a detached ADU's height below 16 feet. No impact fees at 750 sq ft of interior livable space or less; above that, fees must be proportional to the ADU's size compared with the main home. School fees apply over 500 sq ft. Gov. Code § 66321, § 66311.5
- Arizona cities over 75,000 people: must allow an ADU up to 75% of the main home's floor area or 1,000 sq ft, whichever is less, so an 800 sq ft unit needs a main home of at least about 1,070 sq ft. HB 2720
- Washington: cities and counties covered by the state's ADU law can't cap ADUs below 1,000 sq ft. RCW 36.70A.681
- Elsewhere, check your city's maximum ADU size, which is often tied to the main home or the lot.
Ways to bring the cost down
- Keep the footprint simple: a rectangle with a simple roof costs less to frame and roof than an L-shape.
- Put the kitchen and bathroom back to back so plumbing runs are short.
- Place the ADU close to the house's sewer and power to cut trenching.
- Use a city pre-approved plan where your city offers one, to save on design and review.
- Pick standard-size windows, doors and cabinets, and put the budget where tenants notice it.
Ask for a builder quote
Ask for a free quote from an ADU builder in your area
Free, with no obligation. We only share your project with a builder who works in your area.
We share your details with at most one builder, and only one who works in your area.
Paying for it
Most homeowners pay for an ADU with a home equity line, a cash-out refinance, a renovation loan or a construction loan. Compare them in our ADU financing guide, and once you have bids, line them up in the ADU bid comparison.
Frequently asked questions
How much does an 800 sq ft ADU cost?
Across the 16 markets in our 2026 model, the typical midpoint for a new detached 800 sq ft ADU runs from $320,000 in Charlotte, NC to $617,000 in La Jolla, CA, with a median of $411,000. That's all-in: design, permits, utility connections and construction.
What is the cost per square foot for an 800 sq ft ADU?
The median is about $514 per sq ft all-in, compared with $521 at 600 sq ft and $509 at 1,000 sq ft. Fixed costs like permits, hookups, the kitchen and the bathroom are spread over more space as the unit grows.
Can an 800 sq ft ADU have two bedrooms?
Yes, if the bedrooms are small. 800 sq ft fits two modest bedrooms, one bathroom and an open kitchen and living area. It's a comfortable size for a one-bedroom with a den or office.
Why is 800 sq ft a common ADU size in California?
California cities must allow an ADU of up to 800 sq ft with 4-foot side and rear setbacks, even where local size, lot coverage, open space or front setback rules would otherwise block it. They also can't limit a detached ADU's height to less than 16 feet. Many California homeowners design to 800 sq ft for that reason.
Does an 800 sq ft ADU pay impact fees in California?
It can. California bars impact fees on ADUs of 750 sq ft of interior livable space or less. Above that, cities can charge them, but only in proportion to the ADU's size compared with the main home. School district fees apply to ADUs over 500 sq ft.
Sources
- California Government Code § 66321 (ADU size limits)
- California Government Code § 66311.5 (impact and school fees for ADUs; formerly § 66324)
- California Education Code § 17620 (school fees; ADUs over 500 sq ft)
- Arizona HB 2720, Laws 2024, chapter 196
- Washington RCW 36.70A.681 (ADU rules for cities and counties)