Allied Gardens ADU Cost & Builders — 2026

Detached Allied Gardens ADU builds run $190K–$475K all-in ($361–$523/sq ft) once permits, SDC, utility hookups, and finishes are stacked. Compare costs, zoning, rental income, and pull 3 verified quotes below.

Get 3 free quotes from vetted San Diego ADU builders

No spam. No obligation. Avg response time: 1 business day.

Step 1: ProjectStep 2: Contact
4001,500

We never sell your data. You control which builders contact you.

Cost range
$190K–$475K
Permit timeline
10–18 wks
Rent · 1BR
$1,700–$2,100
Rent · 2BR
$2,200–$2,700

Allied Gardens ADU Costs by Build Type

Pricing is derived from the San Diego city average adjusted for Allied Gardens's value cost tier (0.95× baseline).

Build type2026 cost rangeNotes
Detached new build$190K–$475KStand-alone backyard unit, 600–1,000 sq ft
Attached addition$162K–$404KBumped off existing structure
Garage conversion$86K–$214KExisting shell reused
Basement / interior$105K–$261KWhere lot type permits

Allied Gardens ADU Rental Income (2026)

Average rents tracked from San Diego MLS, Zillow, and local rental data. ADUs typically command a 5–15% premium over comparable units due to newer construction.

Unit typeMonthly rentAnnual gross
1 bedroom$1,700–$2,100$20K–$25K/yr
2 bedroom$2,200–$2,700$26K–$32K/yr

Get 3 free quotes from verified Allied Gardens ADU builders

We'll match your lot details with up to 3 builders who have completed ADU projects in or near Allied Gardens. No cost. No obligation. Typical response within 48 hours.

Get 3 free quotes from vetted San Diego ADU builders

No spam. No obligation. Avg response time: 1 business day.

Step 1: ProjectStep 2: Contact
4001,500

We never sell your data. You control which builders contact you.

Allied Gardens Zoning, HOA & Historic Notes

Community plan / overlay
Navajo Community Plan
Permit considerations
Standard City of San Diego ADU process. Mostly flat lots — straightforward foundations.
HOA situation
Allied Gardens is HOA-free for the most part. Some 1950s tracts have CC&Rs that no longer apply post-AB 670.

Always pull a property profile on your specific lot before designing — setbacks, height limits, and FAR can change parcel-by-parcel inside Allied Gardens.

Allied Gardens ADU FAQs

How much does an ADU cost in Allied Gardens, San Diego?

Allied Gardens ADUs typically run $190K–$475K all-in for a 600–1,000 sq ft detached unit in 2026. Costs trend below the San Diego city average due to tighter lots and value-engineered finishes. Per square foot pricing is typically $380–$550.

Are there special permits or overlays for ADUs in Allied Gardens?

Standard City of San Diego ADU process. Mostly flat lots — straightforward foundations. Always pull a property profile before designing — Allied Gardens's Navajo Community Plan can change setback and height requirements lot-by-lot.

What can I rent a Allied Gardens ADU for?

As of 2026, Allied Gardens commands roughly $1,700–$2,100 for a 1-bedroom ADU and $2,200–$2,700 for a 2-bedroom. Rents lean higher with off-street parking, in-unit laundry, and walkability to transit or commercial corridors.

Are HOAs or historic districts an obstacle in Allied Gardens?

Allied Gardens is HOA-free for the most part. Some 1950s tracts have CC&Rs that no longer apply post-AB 670.

How do I get a quote from a verified Allied Gardens ADU builder?

Submit your lot details using the quote form on this page. We'll match you with up to 3 Allied Gardens-area builders who have completed projects within 5 miles. There's no cost or obligation, and quotes typically arrive within 48 hours.

Ready to price your Allied Gardens ADU?

Submit your lot details and we'll match you with up to 3 verified builders in your area. Quotes typically arrive within 48 hours.

Get 3 free quotes from vetted San Diego ADU builders

No spam. No obligation. Avg response time: 1 business day.

Step 1: ProjectStep 2: Contact
4001,500

We never sell your data. You control which builders contact you.