Princeton ADU Permits & Fees [2026]

By-right zoning, 30–60 day approval timeline. Zoning permit, construction permit, utility fees, and inspection schedule.

Permit Types & Costs

Zoning Permit

Confirms the ADU is permitted and meets bulk standards (setbacks, height, coverage).

Cost: $300–$800

Construction Permit (Building)

Covers structural, electrical, plumbing, and general safety compliance.

Cost: $4K–$8K (detached)

Electrical & Plumbing Permits

Separate permits for electrical and plumbing work.

Cost: $2K–$4K combined

Utility Connection Fees

Water, sewer, electric connections. Detached ADU fees typically capped at 50% of primary dwelling fee.

Cost: $2K–$5K (varies by utility)

Timeline

Typical Approval Timeline: 30–60 Days

Week 1: Submit zoning + construction permit applications
Week 2–4: Plan review; clarifications if needed
Week 4–6: Permit issuance (no major revisions)
After: Begin construction; inspections at foundation, utilities, final

Ready to Start Your Permit Process?

Contact a local ADU contractor or architect to prepare plans and handle permitting.