Seattle ADU Permit Fee Calculator (2026)
Instant fee breakdown for Seattle, Washington. Total range: $5,500–$14,000.
Seattle, Washington ADU Permit Fees
Total estimated range: $5,500–$14,000
Plan Check
$1,000–$2,500
Building Permit
$2,000–$4,500
Impact Fees
$0–$8,000
School Fees
N/A
Utility Hookups
$2,500–$7,000
Source: City permitting schedules and FeeBuilder surveys, updated April 2026.
Seattle permit process at a glance
Permitting office: Seattle Department of Construction and Inspections (SDCI)
Typical plan review: 14-22 weeks
Seattle removed the owner-occupancy requirement for DADUs in 2019, and the city now allows up to two ADUs per lot (one attached, one detached). SDCI's pre-approved DADU catalog has grown to about 20 designs that cut plan review to 6-8 weeks if you build straight from the catalog. The Pacific Northwest rain climate is the dominant cost driver — moisture detailing, rain screens, and code-mandated whole-house ventilation per the Washington Energy Code each add real dollars.
Sample real-world fee example
Scenario: 700 sq ft detached ADU on a typical Seattle lot
| Plan check (mid) | $1,200 |
| Building permit (mid) | $2,300 |
| Utility connection (low end) | $2,500 |
| Misc fees (records, inspections) | $1,500 |
| TOTAL (rough mid example) | ~$7,000 |
Common Seattle ADU permit mistakes
- Skipping the SDCI pre-approved DADU catalog check — catalog submittals can cut review to 6-8 weeks.
- Missing the Washington Energy Code whole-house mechanical ventilation requirement.
- Not checking Environmentally Critical Areas overlay (steep slopes, peat bogs, riparian).
- Forgetting that Seattle now allows two ADUs per lot — many homeowners over-design the first when they could split into two smaller units.
How Seattle compares nearby
Get help navigating Seattle ADU permits
Talk to Seattle-area builders who pull ADU permits weekly. They'll review your lot, flag overlay issues, and quote permit-handling fees.
Get 3 free quotes from vetted Seattle ADU builders
No spam. No obligation. Avg response time: 1 business day.
We never sell your data. You control which builders contact you.
Ready to Start Your ADU Project?
Join hundreds of homeowners who used our guides to navigate their ADU build successfully.
✓ Free comprehensive guide ✓ Vetted contractor list ✓ No credit card needed