San Diego, CA

San Diego ADU Permit Fee Calculator (2026)

Instant fee breakdown for San Diego, California. Total range: $5,000–$13,500.

San Diego, California ADU Permit Fees

Total estimated range: $5,000–$13,500

Plan Check

$1,000–$2,500

Building Permit

$1,500–$4,000

Impact Fees

Waived (< 750 sf)

School Fees

$2–$4/sf

Utility Hookups

$2,500–$7,000

Source: City permitting schedules and FeeBuilder surveys, updated April 2026.

San Diego permit process at a glance

Permitting office: City of San Diego Development Services Department

Typical plan review: 12-18 weeks

Fee waivers: ADUs under 750 sq ft are exempt from impact fees per AB 681 (2023).

San Diego's Affordable Homes Bonus Program ('Bonus ADU') lets you stack multiple units on a single lot if you deed-restrict one as affordable, and the city's no-impact-fee policy for ADUs under 750 sq ft (per AB 681) makes sub-750 builds noticeably cheaper. Lots inside the Coastal Zone face a separate Coastal Development Permit through California Coastal Commission review, which can add 3-6 months to the timeline.

Sample real-world fee example

Scenario: 700 sq ft detached ADU on a typical San Diego lot

Plan check (mid)$1,200
Building permit (mid)$1,800
Utility connection (low end)$2,500
Misc fees (records, inspections)$1,500
TOTAL (rough mid example)~$6,500

Common San Diego ADU permit mistakes

  • Skipping the Title 24 energy compliance docs at submittal — adds 4-6 weeks of correction cycles.
  • Confusing the AB 681 impact-fee waiver — it only applies to ADUs strictly under 750 sq ft of conditioned floor area.
  • Missing the separate water-meter and sewer-capacity applications, which run on a parallel track from the building permit.
  • Forgetting the Coastal Development Permit when the lot falls in the Coastal Zone — required even for in-kind replacement.

How San Diego compares nearby

CityTotal fee rangeLink
San Diego$5,000–$13,500(this page)
Chula Vista$4,000–$11,000View →
El Cajon$3,800–$10,500View →
La Jolla$5,000–$13,500View →

Get help navigating San Diego ADU permits

Talk to San Diego-area builders who pull ADU permits weekly. They'll review your lot, flag overlay issues, and quote permit-handling fees.

Get 3 free quotes from vetted San Diego ADU builders

No spam. No obligation. Avg response time: 1 business day.

Step 1: ProjectStep 2: Contact
4001,500

We never sell your data. You control which builders contact you.

Ready to Start Your ADU Project?

Join hundreds of homeowners who used our guides to navigate their ADU build successfully.

✓ Free comprehensive guide    ✓ Vetted contractor list    ✓ No credit card needed