Denver, CO

Denver ADU Permit Fee Calculator (2026)

Instant fee breakdown for Denver, Colorado. Total range: $6,300–$11,500.

Denver, Colorado ADU Permit Fees

Total estimated range: $6,300–$11,500

Plan Check

$800–$2,000

Building Permit

$1,500–$3,500

Impact Fees

$2,000–$6,000

School Fees

N/A

Utility Hookups

$2,000–$5,000

Source: City permitting schedules and FeeBuilder surveys, updated April 2026.

Denver permit process at a glance

Permitting office: Denver Community Planning and Development (CPD)

Typical plan review: 10-18 weeks

Denver only opened ADUs to all single-family zones in 2023 (Expanding Housing Affordability text amendment), and demand has pushed plan review to 10-18 weeks. The hidden cost in Denver is the 36-inch frost depth — every foundation footing has to go below frost line, which means an extra $2,500-$5,000 in concrete and labor versus the warm-climate norm. Detached ADUs also commonly require a separate water tap from Denver Water unless the existing meter is sized up.

Sample real-world fee example

Scenario: 700 sq ft detached ADU on a typical Denver lot

Plan check (mid)$1,000
Building permit (mid)$1,800
Utility connection (low end)$2,000
Misc fees (records, inspections)$1,500
TOTAL (rough mid example)~$5,800

Common Denver ADU permit mistakes

  • Underestimating 36" frost-footing requirements — adds $2,500-$5,000 over warm-climate baselines.
  • Missing the Denver Water tap-size review, which is a parallel track from CPD building permit.
  • Not confirming Expanding Housing Affordability eligibility for the lot — opens additional unit options.
  • Skipping site-drainage review on lots with rear-yard slopes near the Highline Canal.

How Denver compares nearby

CityTotal fee rangeLink
Denver$6,300–$11,500(this page)
Portland$4,300–$11,500View →
Seattle$5,500–$14,000View →
Austin$6,600–$14,500View →

Get help navigating Denver ADU permits

Talk to Denver-area builders who pull ADU permits weekly. They'll review your lot, flag overlay issues, and quote permit-handling fees.

Get 3 free quotes from vetted Denver ADU builders

No spam. No obligation. Avg response time: 1 business day.

Step 1: ProjectStep 2: Contact
4001,500

We never sell your data. You control which builders contact you.

Ready to Start Your ADU Project?

Join hundreds of homeowners who used our guides to navigate their ADU build successfully.

✓ Free comprehensive guide    ✓ Vetted contractor list    ✓ No credit card needed