Texas ADU Permits

Dallas ADU Permits & Requirements

Fees $1,100–$5,500 · 10–20 weeks timeline · Up to 800 sf

Quick Answer

Dallas ADUs: $150K–$300K

Permits: $1,100–$5,500 · Updated April 2026

Get Your Exact Estimate

Permit Fees Breakdown

Fee TypeCost
Board of Adjustment (BOA) Application$600
Building Permit$500–$4,000
Plan Review$200–$800
Utility Connections$500–$1,500

Permit Process Timeline

1

Feasibility & BOA Research

1–2 weeks

Determine if Board of Adjustment approval is needed for your zone

2

BOA Application (if required)

2–4 months

Board of Adjustment review — the longest step in Dallas

3

Plan Preparation

2–4 weeks

Architectural plans meeting Dallas building codes

4

Building Permit Review

10–15 business days

City plan review for code compliance

5

Construction

3–6 months

Build phase with required inspections

6

Final Inspection & CO

1–2 weeks

Final inspection and Certificate of Occupancy

TerraLineFree Beta

Track Every Dollar of Your ADU Build

TerraLine is the construction finance cockpit that shows your loan balance, budget burn, and forecast at completion — all on one screen. No more spreadsheets.

Try TerraLine Free

Zoning & Requirements

Max ADU Size

800 sf

Height Limit

24 ft

Setbacks

5 ft side/rear

Parking

1 off-street space

Key Regulations

  • Dallas calls ADUs 'accessory living quarters' — use this terminology on applications
  • Many zones require Board of Adjustment (BOA) approval — adds 2–4 months to timeline
  • Max ADU size: 800 sf in most Dallas residential zones
  • Garage apartments may have different size/height allowances
  • No owner-occupancy requirement — ADUs can be investment properties
  • Dallas is expanding ADU allowances under the Forward Dallas plan — rules may become more permissive

Climate & Construction Notes

DFW's hail season (March–May) makes impact-resistant roofing and materials worthwhile. High-efficiency HVAC is critical for 100°F+ summer days. Drought-resistant landscaping saves on water costs.

Frequently Asked Questions

How long does it take to get an ADU permit in Dallas?

The typical permit timeline is 10–20 weeks from application to approval. Total project time including design and construction is usually 6–12 months.

What types of ADUs are allowed in Dallas?

Dallas allows detached, attached, garage conversion. Maximum size is 800 sf with a height limit of 24 ft.

Do I need to live on the property to build an ADU in Dallas?

No. Check with Dallas's planning department for the most current requirements.

More Dallas ADU Resources

Ready to Start Your ADU Project?

Join hundreds of homeowners who used our guides to navigate their ADU build successfully.

✓ Free comprehensive guide    ✓ Vetted contractor list    ✓ No credit card needed