San Diego Garage Conversion ADU Cost in 2026: $90K–$180K All-In

The cheapest, fastest path to a permitted ADU in San Diego. Convert a 1-car or 2-car garage into a 250–500 sq ft 1-bedroom rental in 4–6 months for 35–50% less than a new detached build.

Get 3 Free San Diego Garage-Conversion Quotes

Cost Ranges by Garage Size

Garage sizeLowMidHighNotes
1-car (~250 sq ft)$70,000$95,000$130,000Studio layout, single bath, kitchenette
1.5-car (~350 sq ft)$85,000$115,000$150,0001-bedroom + full bath, full kitchen
2-car (~450–500 sq ft)$110,000$145,000$180,000Roomy 1-bedroom or efficient 2-bedroom
Tandem 2-car (~500–600 sq ft)$120,000$160,000$200,000Long, narrow layout; design constraints

All-in pricing includes design, permits (~$8K–$12K San Diego DSD), structural reinforcement, full insulation to Title 24, electrical sub-panel, plumbing, HVAC mini-split, finishes, and utility separation. Excludes landscaping and driveway repair.

What's Specifically Included

Structural engineering report (required by SD DSD)
Building permit + plan review through Development Services
Foundation inspection + slab moisture remediation if needed
Wall framing infill at garage door opening
Title 24 envelope insulation (R-19 walls / R-30 ceiling)
New electrical sub-panel + 100A service from main
Water + sewer tap (often shared with main house)
Mini-split HVAC (heating + cooling)
Kitchenette or full kitchen + bath rough-in
Interior finishes (drywall, flooring, paint, fixtures)
Final inspection + Certificate of Occupancy
Address assignment + separate utility metering (optional)

San Diego Permit + Build Timeline

PhaseTypical Duration
Design + structural plans3–5 weeks
San Diego DSD permit review8–14 weeks
Structural reinforcement + slab work2–3 weeks
Framing infill + MEP rough-in3–5 weeks
Insulation, drywall, finishes5–8 weeks
Final inspection + Certificate of Occupancy1–2 weeks
TOTAL (design → C of O)22–37 weeks (~5–9 months)

Get 3 free quotes from verified San Diego ADU builders

We pre-screen San Diego ADU contractors for licensing, insurance, and ADU-specific experience. Match request takes 60 seconds.

Get 3 free quotes from vetted San Diego ADU builders

No spam. No obligation. Avg response time: 1 business day.

Step 1: ProjectStep 2: Contact
4001,500

We never sell your data. You control which builders contact you.

San Diego Garage Conversion ROI

Sample scenario: 2-car garage conversion at the mid-range price point.

Total project cost (mid)$145,000
20% down (cash or HELOC)$29,000
Loan principal (80%)$116,000
Estimated rate (May 2026)7.5% (30-year)
Monthly payment~$811
Estimated rent (1BR, 400–500 sq ft)$1,950–$2,500/mo
Net cash flow (mid rent − payment)+$1,400/mo
Payback period (cash-on-cash)~5–7 years

San Diego Garage Conversion Red Flags

  • Bid is below $80K for a 2-car garage — almost guaranteed change orders
  • Contractor doesn't include structural engineering report in scope
  • Contractor says "no permit needed" — illegal conversions can't be insured or rented legally
  • Slab moisture test is excluded — California requires it for habitable space
  • No Title 24 compliance plan — required for permit + utility hookup

San Diego Garage Conversion FAQ